Thursday, December 23, 2010
WE Have KEYS
Great news, We have the keys to our new house. It looks great!!!!!! We are extremely happy with how our new home has turned out.
Now just to move in & make it a "HOME".
Friday, December 10, 2010
Practical Completion Stage
We have reached Practical Completion stage & are extremely happy to say the house looks stunning. We can not wait to move in now. Alfresco slab out the back still to be poured. We think the concretor does not want to do this job. This has been going to be completed 5 weeks ago...... Still in progress. Check out pictures below.
Sunday, November 28, 2010
Near finished
Yes, As the heading reads, our home is nearly complete.
All painted, Sparky completed,Wardobe doors fitted & this week the floor tiles will be completed.
Friday, October 29, 2010
Caspers Sanctuary is progressing extremely well.
Yes, once again we have had a delay since the laast post here.
Worth the wait though.....
Carpenter has finished inside & the tilers have now commenced fitting all wet area tiles.
Kitchen & Vanities are installed.
Ready now for the painter & Rendering......
We now know we will be in for Christmas. Great present from Santa Clause...
Enjoy the pictures....
Sunday, October 10, 2010
Advancement
Yes, it has been a while since the last post.
Plumber has installed all pipe work for showers & taps along with gas hot water.
Electrician has prewired, Ducted Air pre install complete.
Brick layer half way through, & Plaster gang has all wallls sheeted & joint sealing has commenced.
To date except for this weekend, only 2 wet days have given us any set backs.
We must say, Perry Homes so far certainly have been easy to deal with.
Lots of pictures to see to catch up on.
Plumber has installed all pipe work for showers & taps along with gas hot water.
Electrician has prewired, Ducted Air pre install complete.
Brick layer half way through, & Plaster gang has all wallls sheeted & joint sealing has commenced.
To date except for this weekend, only 2 wet days have given us any set backs.
We must say, Perry Homes so far certainly have been easy to deal with.
Lots of pictures to see to catch up on.
Friday, September 24, 2010
Lids on!!!!!
Now the lid is on our house. Everything is going well.
Looking good.
But then again, you would not think anything else.
Looking good.
But then again, you would not think anything else.
Sunday, September 19, 2010
ONE WEEK LATER
What a difference a week makes.
The Roof Trusses are now on & fixed in place.
The frame is all squared up.
The Windows & Sliding doors are fitted. & the Gutter & facia are installed.
We have to admit one thing here after seeing the windows today.
We paid for tinted front windows. Although they appear tinted, I would not advise anyone to pay the difference tho have factory tinted windows as you can hardly recognise a tint colour in this glass. Very dissapointed.
Next stage will be roof on & Bricks started..... Heres hoping.
The Roof Trusses are now on & fixed in place.
The frame is all squared up.
The Windows & Sliding doors are fitted. & the Gutter & facia are installed.
We have to admit one thing here after seeing the windows today.
We paid for tinted front windows. Although they appear tinted, I would not advise anyone to pay the difference tho have factory tinted windows as you can hardly recognise a tint colour in this glass. Very dissapointed.
Next stage will be roof on & Bricks started..... Heres hoping.
Friday, September 10, 2010
Roof Trusses on site
Roof Trusses have been delivered today Friday the 10th Sept as previously reported ready for installation on Monday.
Lookig great!!!!
Lookig great!!!!
Walls finished being erected .
Walls have finished being erected today Thursday the 9th September.
Roof trusses ordered for tomorrow ready for installation by crane on Monday.
Roof trusses ordered for tomorrow ready for installation by crane on Monday.
House Frames started to be erected.
Wednesday Midday And workers have started putting up the walls.
Looks great. House is starting to take shape.
More pictures to come.
Looks great. House is starting to take shape.
More pictures to come.
Monday, August 30, 2010
Slab completed
The Floor slab was completed today.
Concrete pouring started at 5.45 am.
Looks great. Ready for Frame delivery.
Concrete pouring started at 5.45 am.
Looks great. Ready for Frame delivery.
Slab Preparation
Our house site is now boxed & ready for the slab pour tomorrow.
The size seems to be growing!!!!!!!!
The size seems to be growing!!!!!!!!